Grand Tour GravelLeadville, Colorado Founding partners

Home / Playbook / Permitting & land use

Playbook · 01 · Foundation

Permitting & land use

A high-country stage race crosses four or five kinds of land in a single week. Every mile has an owner, and each owner has a process. This is the map — and it's the first thing to lock, because permit lead times set the whole calendar.

Who owns the ground

Around Leadville the course will touch, in rough order of how much of it you'll use:

  • U.S. Forest Service — most of the passes and mining roads sit in the Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands (PSICC). The relevant office is the Leadville Ranger District, 810 Front Street, Leadville CO 80461, (719) 486-0749.
  • Bureau of Land Management — some lower stretches and connectors cross BLM land, handled through the local BLM field office via a Special Recreation Permit.
  • County roads — Lake County (Leadville), and depending on route, Park, Chaffee or Gunnison counties. County road-use and any road-closure or traffic-control needs go through the county.
  • CDOT state highways — e.g., Independence Pass is State Highway 82. Racing on an open state highway generally isn't permitted; either avoid it, use it neutralized/transfer only, or arrange a CDOT special-event review with certified traffic control.
  • Private land — the Sugarloaf Mountain Ranch (1,000 acres) is the ace: on private ground you need the owner's agreement and your own insurance, not a public land-management permit. It's the one part of the course with no agency queue.

The USFS special-use event permit (your critical path)

The Forest Service issues special-use permits for organized, temporary recreation events — the category explicitly includes bike races. A permit is required for groups of 75 or more and for all commercial activity (a paid-entry event is commercial), so a stage race clearly needs one.

Start here, and start early. Special-use event applications commonly want 6–12 months of lead time; a multi-day, multi-district race with an environmental review can want more. The permit — not the course design — is usually the long pole in the tent.

How it goes

  1. Pre-application conversation with the Leadville Ranger District. Bring a route map, dates, expected field size, and your safety/sanitation plan. They'll tell you feasibility and what review level applies.
  2. Application (the FS event proposal / SF-299 for the use) with route, schedule, participant numbers, and operating plan.
  3. Environmental review under NEPA — often a categorical exclusion for a low-impact event on existing roads, but that's the district's call and it takes time.
  4. Operating & mitigation plan — Leave No Trace, sanitation (toilets), trash, marking that's removed after, resource protection, and coordination with other permit holders and the public who also use these roads.
  5. Fees — expect a land-use fee (a percent of adjusted gross, or a per-participant basis) plus cost-recovery for the agency's processing/monitoring time. Get the number in writing early; it feeds the budget.
  6. Insurance — the FS will require you to name the United States as additionally insured at a set liability limit (see Sanctioning & insurance).

Everything else, in parallel

  • BLM SRP — if any stage crosses BLM land, file a Special Recreation Permit with the field office; similar cost-recovery + fee model, own timeline.
  • County — road-use permits, and for any closure or flagging on county roads, coordinate with the county road department and sheriff. Some counties want a special-event application of their own.
  • City of Leadville / Lake County — start, finish, expo and any street use in town; venue use at county facilities.
  • Private ranch — a written use agreement with the owner, your certificate of insurance naming them, and a plan for gates, cattle and stewardship.

Sequencing — do it in this order

  1. Call the Leadville Ranger District first and get the real lead time; that date drives everything.
  2. Lock a candidate route good enough to permit (see Course design), knowing it may shift to satisfy land managers.
  3. File USFS + BLM + county applications together so their reviews run concurrently, not back to back.
  4. Secure the ranch agreement and the in-town venues.
  5. Bind insurance and sanctioning so you can name the required insureds on every permit.

Sources & contacts

  • PSICC Special Use & Event Permits — fs.usda.gov/r02/psicc (Special Use and Event Permits)
  • Leadville Ranger District — 810 Front Street, Leadville CO 80461 · (719) 486-0749
  • BLM Special Recreation Permits — blm.gov/programs/recreation/permits-and-passes/special-recreation-permits

Specifics (fees, review level, exact forms) vary by district and route and change year to year — confirm every number directly with the Leadville Ranger District and the BLM field office before you rely on it.

Next: the gate everything hangs on

Sanctioning & insurance All resources